Electrified Double Track Project Between Seremban And Gemas Construction, Commisioning And Maintenance of Infrastructure Works Package III : KM 535.500 ~ KM 563.496
FACT SHEET
Location
Negeri Sembilan, Malaysia
Owner
Ministry of Transport, Malaysia
Consultant
KL Consult Associates Sdn Bhd and Sepakat Setia Perunding Sdn Bhd
Completion Date
September 2013
Scope of Works
Civil Works : Earthwork volume of 2.8 millions cu.m and formation up to sub-ballast platform for 30km of rail trackwork, stone columns, soil replacement, soil nail, cribwall & RE walls
Track Works : 30km of track linking including concrete sleeper, rail, fittings, turnout and Bodan level crossing for main line and depot
Bridge Work : 9 nos of Railway Bridge of span ranges from 25m to 65m
Drainage Work : 100km
Utility : Relocation of fibre optic, telekom, water and power cable including HDD & pipe jacking method and 30km of cable trough